Skip to main content
← Back to list
01Issue
BugOpenExtensionsPublic
AssigneesNone

Relationships

#5061 stagecraft: dispatch attribution when a stage has several dispatches open (products, closing, next)

Opened by skunk-ape · 11/24/2026

Problem

Since #5032 (@swamp/stagecraft 2026.11.24.1), a product write that finishes a stage's work closes its dispatch as succeeded. When a stage has more than one dispatch open, stagecraft can't always tell which dispatch a product belongs to:

  1. Products count toward the wrong dispatch. Closing checks every product recorded in the stage since the target dispatch opened, not only the products recorded for that dispatch. With dispatches 1 and 2 open, products written for dispatch 2 can help close dispatch 1 when a later write names 1.
  2. A write with no dispatchId closes another driver's dispatch. It closes the stage's only open dispatch even when a different driver (for example a remote worker) opened it. That is the documented intent for interactive and call stages, but it is surprising when interactive and remote driving are mixed.
  3. next names someone else's dispatch. The next: hint names only the newest open dispatch, which may belong to another driver.

These only come up with several dispatches open in one stage, which #5032 made rarer.

What to change

  • The run records which dispatch each product write belongs to, and closing a dispatch counts only its own products.
  • A write with no dispatchId does not close a dispatch another driver opened (or the plan justifies the current rule and says so in REFERENCE).
  • next: names the caller's own open dispatch when the caller has a driverId.
  • Run records written before this change still read, and closing on them behaves as it does today.

Done when

  • Tests cover two open dispatches in one stage, with products attributed to each, and a mixed interactive plus remote-driver stage.
  • REFERENCE, driving.md and a DESIGN entry describe the attribution.

Out of scope

Changing what the cap counts, or dispatch's re-run behaviour (both settled in #5032).

02Bog Flow
◉OPEN○TRIAGED○IN PROGRESS○SHIPPED

Open

11/24/2026, 9:03:29 PM

No activity in this phase yet.

03Sludge Pulse
Editable. Press Enter to edit.

system commented 11/24/2026, 9:03:29 PM

Classified automatically when this issue was filed.

  • Source: Extensions

If you feel this classification is incorrect, add a ripple to tell us so.

Sign in to post a ripple.