Skip to main content
← Back to list
01Issue
FeatureOpenExtensionsPublic
AssigneesNone

Relationships

#4414 @swamp/issue-lifecycle: collapse the verification_passed, post_attestation, link_pr sequence

Opened by skunk-ape · 11/5/2026

Problem

verification_passed → post_attestation → link_pr runs in that order in about 130 sessions, against a median of 19 lifecycle calls per session. Lifecycle method calls are about 7.5% of session cost. Each request reloads about 200K tokens of context, so a saved round trip is worth far more than smaller output.

Proposed

A way to do this sequence in one call.

Related: #4408 covers what happens after link_pr; this covers the fixed steps leading up to it.

Figures come from measuring local session transcripts on 2026-11-04. Categories used rough regex matching and cost shares assume standard cache and output pricing, so treat them as estimates.

Upstream repository: https://github.com/swamp-club/swamp-extensions

Environment

  • Extension: @swamp/issue-lifecycle@2026.10.23.1
  • swamp: 20261104.025555.0-sha.dd659114
  • OS: linux (x86_64)
  • Deno: 2.9.8
  • Shell: /usr/bin/bash
02Bog Flow
◉OPEN○TRIAGED○IN PROGRESS○SHIPPED

Open

11/5/2026, 12:44:36 AM

No activity in this phase yet.

03Sludge Pulse
Editable. Press Enter to edit.

system commented 11/5/2026, 12:44:36 AM

Classified automatically when this issue was filed.

  • Source: Extensions

If you feel this classification is incorrect, add a ripple to tell us so.

Sign in to post a ripple.