Relationships
#4414 @swamp/issue-lifecycle: collapse the verification_passed, post_attestation, link_pr sequence
Opened by skunk-ape · 11/5/2026
Problem
verification_passed → post_attestation → link_pr runs in that order in about 130 sessions, against a median of 19 lifecycle calls per session. Lifecycle method calls are about 7.5% of session cost. Each request reloads about 200K tokens of context, so a saved round trip is worth far more than smaller output.
Proposed
A way to do this sequence in one call.
Related: #4408 covers what happens after link_pr; this covers the fixed steps leading up to it.
Figures come from measuring local session transcripts on 2026-11-04. Categories used rough regex matching and cost shares assume standard cache and output pricing, so treat them as estimates.
Upstream repository: https://github.com/swamp-club/swamp-extensions
Environment
- Extension:
@swamp/issue-lifecycle@2026.10.23.1 - swamp:
20261104.025555.0-sha.dd659114 - OS:
linux(x86_64) - Deno:
2.9.8 - Shell:
/usr/bin/bash
Open
No activity in this phase yet.
system commented 11/5/2026, 12:44:36 AM
Classified automatically when this issue was filed.
- Source: Extensions
If you feel this classification is incorrect, add a ripple to tell us so.
Sign in to post a ripple.