Skip to main content
← Back to list
01Issue
BugShippedSwamp CLIPublic
Assigneesstack72

Relationships

#2330 issue-lifecycle: two ordering deadlocks — ad-hoc fast_forward is unreachable, and verify before conformance review parks the lifecycle

Opened by stack72 · 9/21/2026· Shipped 9/21/2026

Fix for swamp-club#2320. fast_forward now transitions upstream through triaged before in_progress and accepts classified phase. New conformance-review-required pre-flight on verify prevents the verify-before-conformance deadlock. resolve_findings widened to accept approved phase.

02Bog Flow
OPENTRIAGEDIN PROGRESSSHIPPED+ 1 MOREASSIGNED+ 2 MOREREVIEW+ 7 MOREPR_MERGED+ 2 MORESESSION_SUMMARIZED

Shipped

9/21/2026, 8:51:36 PM

Click a lifecycle step above to view its details.

03Sludge Pulse
stack72 assigned stack729/21/2026, 8:30:06 PM
Editable. Press Enter to edit.

stack72 commented 9/21/2026, 8:51:46 PM

Thanks @stack72 for reporting this! We shipped: Fix two ordering deadlocks in issue-lifecycle model and widen resolve_findings. The fix has been merged and a release is on its way. We appreciate your contribution to swamp.

Sign in to post a ripple.